- Ahmad, S., and Butt, M. M. (2012). Can after sale service generate brand equity? Marketing Intelligence
& Planning, 30, 307–323.
- Bayındır, Z. P., Erkip, N., and Güllü, R. (2007). Assessing the benefits of remanufacturing option under
one-way substitution and capacity constraint. Computers and Operations Research, 34, 487–514.
- Behfard, S., van der Heijden, M. C., Al Hanbali, A., and Zijm, W. H. (2015). Last time buy and repair
decisions for spare parts. European Journal of Operational Research, 244, 498–510.
- Bradley, J. R., and Guerrero, H. H. (2008). Product design for life‐cycle mismatch. Production and
Operations Management, 17, 497–512.
- Bradley, J. R., and Guerrero, H. H. (2009). Lifetime buy decisions with multiple obsolete parts. Production
and Operations Management, 18, 114–126.
- Çınlar, E. (2011). Probability and Stochastic. Vol 261, Springer Science & Business Media.
- Cohen, M. A., Agrawal, N., and Agrawal, V. (2006). Winning in the aftermarket. Harvard Business
Review, 84, 129.
- Dietrich S. and Daryl J. D. (1983). Comparison Methods for Queues and Other Stochastic Models. Wiley,
New York.
- Fortuin, L. (1980). The all-time requirement of spare parts for service after sales-theoretical analysis and
practical results. International Journal of Operations & Production Management, 1, 59–70.
- Fortuin, L. (1981). Reduction of all-time requirements for spare parts. International Journal of Operations
& Production Management, 2, 29–37.
- Frenk, J. B. G., Javadi, S., Pourakbar, M., and Sezer, S. O. (2019). An exact static solution approach
for the service parts end-of-life inventory problem. European Journal of Operational Research, 272, 496–504.
- Frenk, J. B. G., Javadi, S., Pourakbar, M., and Sezer, S. O. (2019b). An exact static solution approach
for the service parts end-of-life inventory problem. European Journal of Operational Research, 272, 496–504.
- van der Heijden, M., and Iskandar, B. P. (2013). Last time buy decisions for products sold under warranty.
European Journal of Operational Research, 224, 302–312.
- Hekimoğlu, M., van der Laan, E., and Dekker, R. (2018). Markov-modulated analysis of a spare parts
system with random lead times and disruption risks. European Journal of Operational Research, 269, 909–922.
- Huang, W., Kulkarni, V., and Swaminathan, J. M. (2007). Coordinated inventory planning for new and
old products under warranty. Probability in the Engineering and Informational Sciences, 21, 261–287.
- Huang, W., Kulkarni, V., and Swaminathan, J. M. (2008). Managing the inventory of an item with a
replacement warranty. Management Science, 54, 1441–1452.
- Hur, M., Keskin, B. B., and Schmidt, C. P. (2018). End-of-life inventory control of aircraft spare parts
under performance based logistics. International Journal of Production Economics, 204, 186–203.
- Inderfurth, K., and Kleber, R. (2013). An advanced heuristic for multiple‐option spare parts procurement
after end‐of‐production. Production and Operations Management, 22, 54–70.
- Inderfurth, K., and Mukherjee, K. (2008). Decision support for spare parts acquisition in post product
life cycle. Central European Journal of Operations Research, 16, 17–42.
- Javadi S. (2018). On the end-of-life inventory problem (Doctoral dissertation). PhD thesis, Sabanci Uni
versity, Istanbul, Turkey.
- Kim, B., and Park, S. (2008). Optimal pricing, EOL (end of life) warranty, and spare parts manufacturing
strategy amid product transition. European Journal of Operational Research, 188, 723–745.
- Van Kooten, J. P., and Tan, T. (2009). The final order problem for repairable spare parts under condem
nation. Journal of the Operational Research Society, 60, 1449–1461.
- Kleinrock, L. (1975). Queueing Sytems. Vol 1. Wiley, New York.
- Krikke, H., and van Der Laan, E. (2011). Last Time Buy and control policies with phase-out returns:
a case study in plant control systems. International Journal of Production Research, 49, 5183–5206.
- Li, X., Dekker, R., Heij, C., and Hekimoğlu, M. (2016). Assessing end‐of‐supply risk of spare parts using
the proportional hazard model. Decision Sciences, 47, 373–394.
- Padmanabhan, V., and Rao, R. C. (1993). Warranty policy and extended service contracts: Theory and
an application to automobiles. Marketing Science, 12, 230–247.
- Pourakbar, M., van derLaan, E., and Dekker, R. (2014). End-of-life inventory problem with phaseout
returns. Production and Operations Management, 23, 1561–1576.
- Pourakbar, M., Frenk, J. and Dekker, R, (2012). End-of-life inventory decisions for consumer electronics
service parts. Production and Operations Management, 21, 889–906.
- Ross, S. M. (1997). Introduction to Probability Models. Academic Press, New York.
- Sahyouni, K., Savaskan, R. C., and Daskin, M. S. (2010). The effect of lifetime buys on warranty repair
operations. Journal of the Operational Research Society, 61, 790–803.
- Shen, Y., and Willems, S. P. (2014). Modeling sourcing strategies to mitigate part obsolescence. European
Journal of Operational Research, 23, 522–533.
- Shi, Z. (2019). Optimal remanufacturing and acquisition decisions in warranty service considering part
obsolescence. Computers and Industrial Engineering, 135, 766–779.
- Shi, Z., and Liu, S. (2020). Optimal inventory control and design refresh selection in managing part
obsolescence. European Journal of Operational Research, 287, 133–144.
- Solomon, R., Sandborn, P. A., and Pecht, M. G. (2000). Electronic part life cycle concepts and obsoles
cence forecasting. IEEE Transactions on Components and Packaging Technologies, 23, 707–717.
- Teunter, R. H., and Fortuin, L. (1999). End-of-life service. International Journal of Production Economics,
59, 487–497.
- Teunter, R. H., and Haneveld, W. K. K. (1998). The final orders problem. European Journal of Operational
Research, 107, 35–44.
- Westerweel, B., Basten, R. J., and van Houtum, G. J. (2018). Traditional or additive manufacturing?
Assessing component design options through lifecycle cost analysis. European Journal of Operational Research, 270, 570–585.
|