Chen, P. and Weng, H., "A two-phase GA model for resource-constrained project scheduling", Automation in Construction, Vol. 28, pp. 485-498, (2009).
2. Zhang, H., "Ant Colony Optimization for Multimode Resource-Constrained Project Scheduling", American Society of Civil Engineers, Vol. 28, pp. 150-159, (2012).
3. Sprecher, A. and Drexl, A., "Solving multi-mode resource-constrained project scheduling problems by a simple, general and powerful sequencing algorithm", European Journal of Operational Research, Vol. 107, pp. 431–450, (1998).
4. Glover, F. and Greenberg H.J., "New Approaches for Heuristic Search: A Bilateral Linkage with Artificial Intelligence", European Journal of Operational Research, Vol. 39, pp. 119-130, (1989).
5. Jo´ zefowska, J. Mika, M. Rozycki, R. Waligora, G. and Weglarz, J., "Simulated annealing for multi-mode resource-constrained project scheduling", Annals of Operations Research, Vol. 102, pp. 137–155, (2001).
6. Zhang, H. Tom, C.M. and Li, H., "Multimode Project Scheduling Based on Particle Swarm Optimization", Computer-Aided Civil and Infrastructure Engineering, Vol. 21, pp. 93– 103, (2006).
7. Lova, A. Tormos, P. Cervantes, M. and Barber, F., "An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes", International Journal of Production Economics, Vol. 117 (2), pp. 302– 316, (2009).
8. Peteghme, V.V. and Vanhoucke, M., "An artificial immune system for the multi-mode resource-constrained project scheduling problem", in: EvoCOP, Springer, Berlin, Tubingen, Germany, pp. 100-107, (2009).
9. Peteghem, V.V. and Vanhoucke, M., "A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem", European Journal of Operational Research, Vol. 201, pp. 409–418, (2010).
10. Elloumi, S. and Fortemps, P., "A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem", European Journal of Operational Research, Vol. 205, pp. 31–41, (2010).
11. Wang, L. and Fang, C. "An effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problem", Information Sciences, Vol. 181, pp. 4804–4822, (2011).
12. Wang, L. and Fang, C., "An effective estimation of distribution algorithm for the multi-mode resource-constrained project scheduling problem", Computers and Operations Research, Vol. 39, pp. 449–460, (2012).
13. Lee, K. and El-Sharkawi, M., "Modern heuristic optimization techniques", Hoboken, New Jersey, John Wiley and Sons, pp. 50-157, (2008).
14. Damak, N. Jarboui, B. Siarry, P. and Loukil, T., "Differential evolution for solving multi-mode resource constrained project scheduling problems", Computers and Operations Research, Vol. 36, pp. 2653-2659, (2009).
15. Mendes, R. Kennedy, J. and Neves, J., "The Fully Informed Particle Swarm: Simpler, Maybe Better", IEEE Transactions on Evolutionary Compution, Vol. 14, pp. 204-210, (2004).
16. Sprecher, A. Hartmann, S. and Drexl, A., "An exact algorithm for project scheduling with multiple modes", OR Spektrum: Organ der Deutschen Gesellschaft fur Operations Research, Vol. 19(3), pp. 195-203, (1997).
17. Kolisch, R., "Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation", European Journal of Operational Research, Vol. 43, pp. 23–40, (1996).
18. Tormos, P. and Lova, A., "A competitive heuristic solution technique for resource-constrained project scheduling", Annals of Operations Research, Vol. 102, pp. 65–81, (2001).
19. Ranjbar, M. Reyck, B. and De Kianfar, F., "A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling", European Journal of Operational Research, Vol. 193(1), pp. 35–48, (2009).
20. Alcaraz, J. Maroto, C. and Ruiz, R., "Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms", Journal of the Operational Research Society, Vol. 54, pp. 614–626, (2003).