- Abulnour, A. H. (2014). The post-disaster temporary dwelling: Fundamentals of provision, design and construction. HBRC Journal, 10(1), 10–24. doi:10.1016/j.hbrcj.2013.06.001
- Aquilino, M. J. (Ed.). (2011). Beyond shelter Architecture for Crisis. London: Thames & Hudson.
- Arslan, H. (2007). Re-design, re-use and recycle of temporary houses. Building and Environment, 42, 400-406. doi:10.1016/j.buildenv.2005.07.032
- Arslan, H., & Cosgun, N. (2008). Reuse and recycle potentials of the temporary houses after occupancy:Example of Duzce, Turkey. Building and Environment, 43, 702–709. Doi: 1016/j.buildenv. 2007.01.051
- Asefi, M., & Farrokhi, Sh. (2017). Proposing a Model for the Design of Post-Disaster Temporary Housing Based on the Needs of the Injured with Post-Implementation Evaluation Approach (Case Study: Earthquake-Stricken Villages in Heris of East Azerbaijan). Journal of Research and Rural Planning. doi:22067/jrrp.v5i4.64121
- Barakat, S. (2003). Housing reconstruction after conflict and disaster. London: Overseas Development Institute. Retrieved 11 19, 2014, from odihpn.org
- Bedoya, F. G. (2004). Habitat transitorily Viviana para emergencies.
- Biswas, A. (2019). Exploring Indian post-disaster temporary housing strategy through a comparative review. International Journal of Disaster Resilience in the Built Environment, 10(1), 14-35. doi: 1108/IJDRBE-09-2018-0037
- Blaikie, P., Cannon, T., Davis, I., & Wisner, B. (2014). At risk: natural hazards, people's vulnerability and disasters.
- Celik, E. (2017). A cause-and-effect relationship model for location of temporary shelters. International Journal of Disaster Risk Reduction. 2.257-268. https://doi.org/10.1016/j.ijdrr.2017.02.020
- Chandler, P. J., Reams, M., & Committee, C. (2007). Environmental factors influencing the sitting of temporary housing in Orleans Parish. LSU Master's Theses. 3888. https://digitalcommons.lsu.edu/ gradschool_theses/3888
- Chen, Z., Chen, X., Li, Q., & Chen, J. (2013). The temporal hierarchy of shelters: a hierarchical location model for earthquake-shelter planning. International Journal of Geographical Information Science, 27(8). 1612–1630, http://dx.doi.org/10.1080/13658816.2013.763944
- Chua, J., & Su, Y. (2012). The Application of TOPSIS Method in Selecting Fixed Seismic Shelter for Evacuation in Cities. Systems Engineering Procedia, 3, 391 – 397. doi:10.1016/j.sepro.2011.10.061
- Collins, S., Corsellis, T., & Vitale, A. (2010). Transitional shelter: understanding shelter from the emergency through reconstruction and beyond. Retrieved 10 10, 2014, from www.alnap.org
- Corsellis, T., & Vitale, A. (2011). Transitional settlement displaced populations. Cambridge: University of Cambridge. Retrieved from http://www.shelterproject.org
- Cosgun, N., & Tas, M. (2007). A qualitative evaluation of the after earthquake permanent housings in Turkey in terms of user satisfaction Kocaeli, Gundogdu Permanent Housing model. Building and Environment, 42, 3418–3431
- Da Silva, J. (2010). Key Considerations in Post-Disaster Reconstruction.
- Davidson, C. H. (2009). The challenge of organizational design for manufactured construction. Construction Innovation, 9(1), 42-57. doi:1108/14714170910931534
- Davidson, C. H., Johnson, C., Lizarralde, G., Dikmen, N., & Sliwinski, A. (2007). Truths and myths about community participation in post-disaster housing projects. Habitat International, 31(1), 100–115. doi: 1016/j.habitatint.2006.08.003
- Davis, I. (1978). Shelter after disaster. Oxford: Oxford Polytechnic Press.
- Davis, I., & Alexander, D. (2016). Recovery from Disaster, Rout ledge [22].Davis, I. IFRC. & OCHA. (2015). Shelter after Disaster, 2nd ed., Switzerland.
- DFID, U. (2010). Shelter after disaster. Shelter Centre.
- Shelter Centre (2012). Transitional shelter guidelines. sheltercentre.org/library.
- Sener, S. M., & Altum, M. C. (2009). Design of a post disaster temporary shelter unit. A|Z ITU Journal of the Faculty of Architecture,6, 58–74. https://www.az.itu.edu.tr/azv6n2web/06seneraltun0602.pdf
- Bologna, R. (2006). Strategic planning of emergency areas for transitional settlement. In 2006 international conference and student competition on post-disaster reconstruction “meeting stakeholder interests” Florence, Italy. May 17–19, 2006. http://www.grif.umontreal.ca/pages/BOLOGNA_Roberto.pdf
- Shaw, R., Takeuchi, Y., Uy, N., & Sharma, A. (2008). Policy note: indigenous knowledge–disaster risk reduction. EU, UNISDR, Kyoto University and Seeds, Kyoto.
- Garofalo, L., & Hill, D. (2008). Prefabricated recovery: post-disaster housing component production and delivery. Without a Hitch-New Directions in Prefabricated Architecture, 64-71.
- El-Anwar, O., El-Rayes, K., & Elnashai, A. (2009a). Disasters, Optimizing Large-Scale Temporary Housing Arrangements after Natural. Computing in Civil Engineering, 23(2). 110-118. doi: 10.1061/(ASCE)0887-3801(2009)23:2(110))
- El-Anwar, O., El-Rayes, K., & Elnashai, A. (2009b). An automated system for optimizing post-disaster temporary housing allocation. Computing in Civil Engineering, 23(2), 110-118. doi:10.1061/ (ASCE) 0887-3801(2009)23:2(110))
- Félix, D., Branco, J. M., & Feio, A. (2013). Temporary housing after disasters: A state of the art survey. Habitat International, 136-141. doi:1016/j.habitatint.2013.03.006
- Félix, D., Monteiro, D., Branco, J.M., Bologna, R., & Feio, A. (2015). The role of temporary accommodation buildings for post-disaster housing reconstruction. Journal of Housing and the Built Environment, 30 (4). 683-699. doi: 1007/s10901-014-9431-4
- Gharaati, M., & Davidson, C. (2008). Who Knows Best? An Overview of Reconstruction after the Earthquake in Bam, Iran. Proceedings ofthe.
- Hadafi, F., & Fallahi, A. (2010). Temporary Housing Respond to Disasters in Developing Countries- Case Study: Iran-Ardabil and Lorestan Province Earthquakes. World Academy of Science, Engineering and Technology, 4(6), 1219-1225. Retrieved 12 1, 2014. from http://waset.org
- Hall, A. D. (1962). A methodology for systems engineering. John Wiley & Sons.
- Hidayat, B. a. (2010). A literature review of the role of project management in post-disaster reconstruction. Procs 26th Annual ARCOM Conference (pp. 1269-1278). Association of Researchers in Construction Management. Retrieved March 15, 2016. from http://usir.salford.ac.uk
- Hosseini, S. A., de la Fuentea, A., & Pons, O. (2016a). Multi-criteria decision-making method for assessing the sustainability of post-disaster temporary housing unit’s technologies: A case study in Bam, 2003. Sustainable Cities and Society, 20, 38-51.
- Hosseini, S. M. A., de la Fuentea, A., & Pons, O. (2016b). Multi- criteria Decision-Making Method for Sustainable Site Location of Post-Disaster Temporary Housing in Urban Areas. Construction Engineering and Management. doi: 1061/(ASCE)CO.1943-7862.0001137
- IEES, International Institute of Earthquake Engineering and Seismology. (2017, November). Earthquake report, Sarpol-e Zahab Kermanshah Province, (fifth ed).
- Johnson, C. (1995). Strategies for the reuse of temporary housing. Management, 4(3), 43-53.
- Johnson, C. (2002). What’s the big deal about temporary housing? Planning considerations for temporary accommodation after disasters: Example of the 1999 Turkish earthquakes. In 2002 TIEMS disaster management conference. Bibliography 192
- Johnson, C. (2007a). Impacts of prefabricated temporary housing after disasters: 1999 earthquakes in Turkey. Habitat International, 31(1), 36–52. doi:1016/j.habitatint.2006.03.002
- Johnson, C. (2007b). Strategies for the reuse of temporary housing. Urban Trans Formation Conference, Holcim Forum for Sustainable Construction. Shanghai, China
- Johnson, C. (2007c). Strategic planning for post-disaster temporary housing. Disasters, 31 (4), 435 - 458. doi:1111/j.0361-3666.2007.01018.x
- Johnson, C. (2009). Planning for temporary. In C. J. Gonzalo Lizarralde, Rebuilding after disasters: from emergency to sustainability (pp. 70-87). Taylor & Francis.
- Johnson, C., Lizarralde, G., & Davidson, C. H. (2006). A systems view of temporary housing projects in post-disaster reconstruction. Construction Management and Economics, 24(4), 367–378. doi:1080/01446190600567977
- Kapucu, N., & Garayev, V. (2011). Collaborative decision-making in emergency and disaster management. International Journal of Public Administration, 34(6), 366-375. doi:10.1080/01900692.2011.561477
- Kelly, C. (2010). Strategic site selection and management. San Francisco: World Wildlife Fund, American National Red Cross. Retrieved 9 12, 2014, from http://green-recovery.org
- Kennedy, J., Ashmore, J., Babister, E., & Kelman, I. (2008). The Meaning of ‘Build Back Better’: Evidence from Post-Tsunami Aceh and Sri Lanka. Contingencies and Crisis Management, 16(1), 24–36. doi: 1111/j.1468-5973.2008.00529.x
- Khazai, B., & Hausler, E. (2005). Intermediate Shelters in Bam and Permanent Shelter Reconstruction in Villages Following the 2003 Bam, Iran, Earthquake. Earthquake Spectra, 21(S1), 487–511. doi: 1193/1.2098907
- Lindell, M. K., & Prater, C. S. (2003). Assessing community impacts of natural disasters. Natural hazards review, 4(176), 176-185. doi:1061/(ASCE)1527-6988(2003)4:4(176)
- Lizarralde, G., & Davidson, C. (2006). Learning from the poor. I-Rec conference proceedings 2006: post-disaster reconstruction: Meeting the sta eholders’ interest.
- Lizarralde, G., Johnson, C., & Davidson, C. (2009). Rebuilding after disasters: from emergency to sustainability. Taylor & Francis. Pdf
- Lizarralde, G., & Massyn, M. (2008). Unexpected negative outcomes of community participation in low-cost housing projects in South Africa. Habitat international, 32(1), 1-14. https://doi.org/10.1016/j.habitatint.2007.06.003
- Gulahane, K., & Gokhale, V. A. (2012). Design criteria for temporary shelters for disaster mitigation in India. In G. Lizarralde, R. Jigyasu, R. Vasavada, S. Havelka & J. Duyne Barenstein (Eds.), Participatory design and appropriate technology for disaster reconstruction. Conference proceedings. 2010 international i-Rec conference
- Caia, G., Ventimiglia, F., & Maass, A. (2010). Container vs. dacha: The psychological effects of temporary housing characteristics on earthquake survivors. Journal of Environmental Psychology,30, 60–66. https://doi.org/10.1016/j.jenvp.2009.09.005
- Kellett, P., & Moore, J. (2003). Routes to home: homelessness and home-making in contrasting societies. Habitat International, 27(1), 123-141. https://doi.org/10.1016/S0197-3975(02)00039-5
- Allison, E. H., & Ellis, F. (2001). The livelihoods approach and management of small-scale fisheries. Marine policy, 25(5), 377-388. https://doi.org/10.1016/S0308-597X(01)00023-9
- Twigg, J. (2006). Technology, post-disaster housing reconstruction and livelihood security. In B. H. Centre (Ed.), Disaster studies working paper no. 15.
- Chang, Y., Wilkinson, S., Potangaroa, R., & Seville, E. (2010). Resourcing challenges for post-disaster housing reconstruction: a comparative analysis. Building Research & Information, 38(3), 247-264. https://doi.org/10.1080/09613211003693945
- Nigg, J. M., Barnshaw, J., & Torres, M. R. (2006). Hurricane Katrina and the flooding of New Orleans: Emergent issues in sheltering and temporary housing. The Annals of the American Academy of Political and Social Science, 604(1), 113-128.
- El-Masri, S., & Kellett, P. (2001). Post-war reconstruction. Participatory approaches to rebuilding the damaged villages of Lebanon: a case study of al-Burjain. Habitat International, 25(4), 535-557. https://doi.org/10.1016/S0197-3975(01)00023-6
- KelleTT, P., & Tipple, A. G. (2000). The home as workplace: a study of income-generating activities within the domestic setting. Environment and Urbanization, 12(1), 203-214. https://doi.org/10.1177%2F095624780001200115
- Nojavan, M., & Omidvar, B. (2013). The Selection of Site for Temporary Sheltering using Fuzzy Algorithms;Case study: Tehran Metropolitan after earthquake,Municipal districts No 1. 31, 205-221. [In Persian] Retrieved 11 5, 2014, from http://www.sid.ir/fa/VEWSSID/J_pdf/28713923112.pdf
- Omidvar, B., Baradaran-Shoraka, M., & Nojavan, M. (2013). Temporary site selection and decision-making methods: a case study of Tehran, Iran. Disasters, 37(3), 536−553. doi: 1111/disa.12007
- Peacock, W. G., Dash, N., & Zhang, Y. (2007). Sheltering and Housing Recovery Following Disaster. In Handbook of disaster research (pp. 258-274). New York: Springer. doi:1007/978-0-387-32353-4_15
- Pelling, M. (2012). The vulnerability of cities: natural disasters and social resilience.
- Perrucci, D., Baroud, H. (2020). A Review of Temporary Housing Management Modeling: Trends in Design Strategies, Optimization Models, and Decision-Making Methods. Sustainability, 12, 10388. https://doi.org/10.3390/su122410388
- Quarantelli, E. L. (1995). Patterns of shelter and housing in US disasters. Disaster Prevention and Management, 4, 43-53.
- Sadiqi, Z., Coffey, V., & Trigunarsyah, B. (2012). Rebuilding Housing after a Disaster: Factors for Failure. International Institute for Infrastructure, Renewal and, (pp. 292-300).
- Sliwinsky, A. (2007). Social dynamics in participatory reconstruction: an anthropological analysis from El Salvador., (pp. 225-234).
- Soltani, A., Ardalan, A., Boloorani, A. D., Haghdoost, A., & Hosseinzadeh-Attar, M. J. (2014). Site Selection Criteria for Sheltering after Earthquakes: A Systematic Review. PLoS currents, 6. Retrieved4 1, 2015, from http://www.ncbi.nlm.nih.gov
- Sphere Association. (2018). The Sphere Handbook: Humanitarian Charter and Minimum Standards in Humanitarian Response, (4nd ed., pp. 237–287), Geneva, Switzerland. spherestandards. org/handbook
- United Nations (UN). (2013). Housing. (United Nations Statistics Division) Retrieved from http://unstats.un.org
- United Nations Disaster Relief Organization (UNDRO). (1982). Shelter after disaster: Guidelines for assistance. New York: UN.
- Wagemann, E. (2017). Need for adaptation: transformation of temporary houses, Disasters, 41(4), 828-851. doi:10.1111/disa.12228
- Wei, L., Li, W., Li, K., Liu, H., & Chenguse, a. L. (2012). Decision Support for Urban Shelter Locations Based on Covering Model. Procedia Engineering, 43, 59 – 64. doi:1016/j.proeng.2012.08.011
- Yi, H., & Yang, J. (2014). Research trends of post disaster reconstruction: The past and the future. Habitat International, 42, 21-29. doi: 1016/j.habitatint.2013.10.005
- Yu, H. & Bai, G. (2018). Research on Modularization and Sustainable Design of Temporary Housing. Art and Design Review, 06(03), 125-132. doi: 4236/adr.2018.63012.
- Lizarralde, G., & Root, D. (2007, May). Ready-made shacks: Learning from the informal sector to meet housing needs in South Africa. In CIB world banking conference.
- Askar, R., et al. (2019, February). From Temporary to Permanent; A Circular Approach for Post-disaster Housing Reconstruction. In IOP Conference Series: Earth and Environmental Science.
|